OPENMATH-2026 outside-participant trial
Status: PREPARED; OUTSIDE PARTICIPANT RETURN PENDING. This procedure does not assert a launch, successful return, mathematical independence, or certification.
The initial bounded trial is H1 replay closure. At preparation, protected MATHSOLVE 99757ce4a816a2f845609d74d31fc0f86a7355a2 registers:
| Binding | Exact value |
|---|---|
| Assignment | OM26-H1-WP02 |
| Dispatch | OM26-H1-WP02-IA-001 |
| Agent reference | INDEPENDENT-AGENT-102 |
| Immutable task | Complete bounded task |
| Durable return | Exact return issue |
Before launch, re-read the protected assignment registry and current status. Confirm this exact assignment remains current and unstaffed. If it has advanced or is staffed, do not reuse this trial binding or allocate a duplicate lease; select a separately protected current assignment.
- A genuine outside participant verifies ordinary authenticated GitHub commenting capability, directly or through an explicitly authorized relay in their own environment. Pseudonymous participation is allowed; no GCL-specific permission is required. If unavailable, stop before substantive work with
RETURN_TRANSPORT_UNAVAILABLE. Do not post a synthetic result or a preflight comment that resembles a result envelope. - Launch with only the immutable task URL and the canonical kickoff from the participant entrypoint. Preserve exact lease identity and the task's bounded scope. Record a genuine launch receipt through the existing protected lifecycle.
- The participant posts one complete
GCL-RETURN-RELAY/1envelope to the exact return issue. Retain the comment URL and posting actor as transport provenance. Posting identity alone does not prove independent reasoning. - Inspect the protected intake receipt and exact controller run/job evidence. Follow capture, replay, bounded adjudication, Programme reconciliation, and successor generation through
ADVANCED, or retain the exact protected blocker and deterministic recovery action. Do not wake the controller manually to disguise a broken automatic route. - Read back the protected Solve assignment/result/receipt and Programme projection. Record the exact result hashes, run/job identities, protected merge identities, and outcome in the existing lifecycle evidence surfaces before claiming trial completion. An exact mathematical blocker is a valid bounded result; structural processing is not mathematical certification.
Voluntary participation across all seven hills may proceed through the same entrypoint without waiting for this trial. This is optional assurance when a participant arrives. Verify each exact current lease independently; public discovery does not create additional assignments. This procedure grants no repository mutation, claim promotion, competition submission, or certification authority.